Freiburg‘s largest solar energy installation situated on this former waste disposal site went on stream at the end of 2011 and provides, with its total output of 2.5 Megawatt Peak (MWp) enough electricity for 1000 households. The gas from the landfill site is drawn off and mixed with biogas from an organic waste fermentation plant, piped to a combined heating and power station (CHP) in the district of Freiburg-Landwasser and then used to produce electricity and heat.
To be viewed from the outside, guided tours by appointment.